The UAE Water Security Strategy 2036 targets strategic water storage reserves equivalent to 25 days of national consumption. Building this strategic reserve requires significant investment in reservoir construction and distribution infrastructure. We supply the equipment and piping systems that move treated water from desalination and treatment plants to the storage and distribution network.
Distribution system reliability is as important as desalination plant capacity — stored water is useless if it cannot be reliably delivered. We source distribution equipment with local service capability in the UAE, ensuring that maintenance parts and support are available for the life of the infrastructure.
Yes — GRP panel tanks certified for potable water contact (NSF 61 or equivalent) are available in capacities from 50 m³ to several thousand m³.
Yes — variable speed drive pumping stations for pressure zone management and demand-responsive operation are available.
Yes — SCADA and telemetry systems for water distribution network monitoring, pressure management, and leak detection are available.