China is the main source of process equipment for factories across the Gulf, from packaging and beverage lines to pumps, compressors, storage tanks, solar plants and battery energy storage systems. Prices are competitive and the choice is huge, but the difference between a successful project and a costly one is decided by how the whole chain is managed, not by the quotation price. Below is the step-by-step approach the Infinity Group team uses for clients in the UAE and the GCC.
Chinese manufacturers will almost always offer a "cheaper equivalent". To compare offers fairly, fix the requirements first: capacity, raw materials, utilities (400 V / 50 Hz in the UAE, 60 Hz in Saudi Arabia — confirm at your site), ambient conditions (design for summer temperatures above 45 °C, humidity and dust), automation level, applicable standards and the list of spare parts for the first two years. A clear specification protects you at acceptance and during warranty claims.
Online marketplaces show trading companies and factories side by side. Before any prepayment, check:

Our Guangzhou team carries out sourcing and supplier verification and factory inspections on site.
The contract should describe the specification, delivery schedule, acceptance procedure and warranty, not just the price. Pay attention to:
Send us the specification and we will calculate the delivered price to the UAE or KSA, including freight, duty and VAT.
UAE. Most industrial machinery clears customs on the standard document set. Some product groups (for example electrical equipment, certain building materials and items under MoIAT technical regulations) require conformity certification before sale. Check the HS code and the applicable regulation before you order.
Saudi Arabia. All shipments to the Kingdom now require certificates issued through SABER, the SASO platform: a Product Certificate of Conformity (PCoC) for each product, typically valid for one year, and a Shipment Certificate of Conformity (SCoC) for every consignment. Since 1 October 2025, the SCoC is a prerequisite for the customs declaration in FASAH, for both regulated and non-regulated goods. Apply before the cargo arrives — a late application can lead to detention at the port. Separate SASO technical regulations also apply to certain machinery, such as lifting equipment.

Most equipment travels by sea from Shanghai, Ningbo, Shenzhen or Guangzhou to Jebel Ali (Dubai), Khalifa Port (Abu Dhabi), Dammam or Jeddah (Saudi Arabia), Hamad Port (Qatar) or Sohar (Oman). Port-to-port transit is typically around three to four weeks, depending on the route and carrier.
See our heavy-lift and oversized cargo and container and multimodal services.

All six GCC states apply the GCC Common Customs Tariff: most goods imported from outside the customs union pay 5% duty on the CIF value (cost, insurance and freight). Some categories are exempt or taxed at other rates, so always confirm by HS code. VAT is charged on the CIF value plus duty and differs by country:
| Country | Customs duty (most goods) | VAT on imports |
|---|---|---|
| UAE | 5% of CIF | 5% (recoverable for VAT-registered businesses) |
| Saudi Arabia | 5% of CIF | 15% |
| Bahrain | 5% of CIF | 10% |
| Oman | 5% of CIF | 5% |
| Qatar | 5% of CIF | No VAT |
| Kuwait | 5% of CIF | No VAT |
Rates as of November 2026. Specific HS codes may have different rates or exemptions.
Worked example (UAE mainland): equipment with a CIF value of USD 500,000 pays USD 25,000 customs duty (5%). Import VAT is 5% of USD 525,000, i.e. USD 26,250, which a VAT-registered company can usually recover in its return. Add clearance, port handling and inland delivery to get the full landed cost.

Agree in the contract who supervises installation, how many specialists the supplier sends, how long they stay and who pays visas, flights and accommodation. Prepare foundations, utilities and lifting equipment before the cargo arrives. Commissioning ends with a Site Acceptance Test (SAT), operator training and handover of documentation and spare parts.
We take on the full chain — from the specification and supplier search to delivery, customs clearance and commissioning — under our EP+S, PMC and PCL models. Our Guangzhou office handles factory audits and quality control, and our Abu Dhabi office manages delivery and project execution in the UAE and the GCC. See turnkey supply of production lines and customs clearance.
Manufacturing takes from a few weeks for standard equipment to several months for custom-built units. Sea freight to Jebel Ali or Khalifa Port is typically around three to four weeks, plus customs clearance and inland delivery. We fix the exact timeline in the project schedule.
The standard GCC rate is 5% of the CIF value, plus 5% VAT on CIF value and duty. Factories with a MoIAT industrial production licence can apply for exemption on machinery, equipment and raw materials used in production.
Yes. Every shipment needs a Shipment Certificate of Conformity issued through SABER before the customs declaration, and the product itself needs a Product Certificate of Conformity or a self-declaration, depending on the regulation.
Yes, but then supplier verification, quality control, logistics and customs are entirely on your side. Infinity Group handles these tasks and acts in the interests of the buyer.
A free zone suits re-export and storage, since duty is suspended. If the equipment is installed in a mainland factory, duty applies when it leaves the free zone, unless the factory has a MoIAT exemption.
If you have questions, get a consultation from our manager.
Sources: GCC Common Customs Law; PwC Worldwide Tax Summaries (UAE); Ministry of Industry and Advanced Technology (MoIAT) service guides; SASO / SABER; Germany Trade & Invest (GTAI); Infinity Group project data.